Moradabad · Firozabad · Delhi · Jodhpur · Saharanpur
50 units (bespoke) to 5,000 units (retail)
35-90 days FOB
UL · CE · UKCA · SASO · IP-rated · LM-79
IEC 60598 · LM-79/LM-80 · CE / UL safety
USA · UK · EU · GCC · AU · CA
Lighting categories and cluster specialisation
Brass and metal lighting — Moradabad
Moradabad is India's Brass City — 400+ years of continuous foundry tradition, and the dominant origin for brass, copper, gunmetal and bronze lighting fixtures exported worldwide. Capabilities: sand casting, centrifugal casting, gravity die, hand spinning, CNC spinning. Finish options: electroplated (brass, copper, nickel, gunmetal, antique), hand-patinated, powder-coated, lacquered. MOQ 500 units. Lead time 35-45 days.
Hand-blown and decorative glass — Firozabad
Firozabad produces a substantial portion of the world's hand-blown decorative glass — the same furnaces that make Indian glass bangles are equally fluent in lighting shades, chandeliers, wall sconces and pendant globes. Capabilities: soda-lime hand-blown, lead crystal, pressed glass, cut / frosted / lustred finishes, lampworked accents. MOQ 1,000 units for standard shapes, 500 for premium.
Industrial-iron and welded steel — Delhi NCR
Delhi NCR (Noida, Gurugram, Ghaziabad) is the industrial-iron lighting cluster — welded steel pendants, industrial-loft aesthetic, iron cages, wire-cage pendants, chain-suspended fixtures. Capabilities: laser cutting, TIG / MIG welding, powder-coating, black-oxide finishing. MOQ 300-500 units. Lead time 30-40 days.
Bespoke and luxury assembly — Jodhpur / Saharanpur
For luxury and bespoke programmes (hospitality FF&E, custom residential, high-end retail), we run mixed-material assembly across Jodhpur (wood + brass + iron combinations) and Saharanpur (carved wood chandeliers, wooden shade frames). MOQ 50-100 units. Lead time 60-90 days. Bespoke commissions accepted at single-piece MOQ for interior-design programmes.
Compliance and certification — destination markets
Lighting is a regulated category in every major buyer market. Compliance requirements vary by destination and product complexity (mains-voltage vs low-voltage, indoor vs outdoor, general lighting vs task lighting). Our compliance layer covers:
- USA — UL 1598 (luminaires), UL 8750 (LED equipment), FCC Part 15 (electromagnetic compatibility), Energy Star for efficient lighting.
- UK — UKCA marking on all mains-voltage products. BS EN 60598 (luminaires) harmonised with EU.
- EU — CE marking. EN 60598 (luminaires). EN 55015 (radio disturbance). EN 61000-3-2 (harmonic emissions). RoHS 3 (restricted substances). EMC and Low Voltage directives.
- GCC — SASO certification for KSA, ESMA G-Mark for UAE, harmonised across GCC via GSO. IECEE CB scheme accepted for both.
- Australia — AS/NZS 60598 (luminaires) harmonised with IEC. RCM (Regulatory Compliance Mark) required.
- Photometric — LM-79 (photometric output measurement), LM-80 (LED chip degradation testing) for LED programmes.
- IP rating — IP20 (dry indoor) to IP65 (wet / outdoor) as applicable.
LED integration — the modern lighting programme
Ninety percent of lighting programmes shipping from India in 2026 integrate LED illumination — either as bulb-holder (E12/E14/E17/E26/E27/GU10 socket compatibility) or as integrated LED (chip-on-board direct integration). LED integration requires additional compliance steps: LM-80 chip degradation testing (typical 6,000-10,000 hour test), driver compatibility validation (Meanwell / Osram / Philips drivers common), thermal management verification (heatsink adequacy for the LED wattage), and colour-consistency binning (LEDs within 3-SDCM MacAdam ellipse across a production batch).
Our lighting sourcing includes LED integration engineering as a bundled service — matching LED chip supplier (Osram, Cree, Nichia, Samsung, or Chinese alternatives), driver selection, thermal design and photometric validation to the buyer's specification. LM-79 photometric certification is included on every LED programme.
Retail programmes vs hospitality FF&E — different economics
Two lighting-sourcing operating models coexist. Retail programmes (mass-market to specialty retail) run on standardised SKUs, container-loaded FOB, 40-ft container as the shipping unit, LC-based payment, and 90-120 day production cycles. Hospitality FF&E (Marriott, Hilton, Jumeirah, Kempinski project-specific) runs on project-milestone deliveries, phased shipping (often air freight for critical-path components), progress-payment structures aligned to project construction milestones, and 6-24 month project timelines. Our lighting-sourcing team runs both models — the workflow choices differ significantly.
Frequently asked
LightingSourcingIndia—commonquestions.
What is the MOQ for lighting sourcing from India?
Category-dependent. Brass pendants (Moradabad): 500 units MOQ typical, 200 for bespoke programmes. Hand-blown glass (Firozabad): 1,000 units for standard shapes, 500 for premium. Industrial-iron (Delhi NCR): 300-500. Luxury assembly (Jodhpur/Saharanpur): 50-100. Bespoke commissioned pieces: single-piece MOQ available for interior-design and hospitality programmes.
How do you handle UL certification for US-bound lighting?
UL 1598 (luminaire safety) is arranged through UL India lab in Bengaluru or via cross-recognition with our overseas UL testing partner network. Typical UL certification timeline: 6-10 weeks from sample to UL Recognised marking. Buyer's UL File Number is used where the buyer holds one; new File Number issued where they don't.
What LED chips do your factories use?
Buyer-driven. Osram (German), Cree (US), Nichia (Japanese), Samsung (Korean) LEDs are all supported — provides brand-compatibility for buyers who specify. Chinese LED chips (Bridgelux, Lumileds Asia, San'an) are lower-cost alternatives. Chip choice is documented on every PO.
Can you integrate smart-home / IoT features into lighting programmes?
Yes — WiFi (Tuya / Espressif), Zigbee (Silicon Labs), Bluetooth Mesh smart-lighting integration is available. Smart-lighting adds electrical certification complexity (FCC / CE for RF) and requires the buyer to specify the ecosystem (Amazon Alexa, Google Home, Apple HomeKit, or standalone app). Additional 15-20 days lead time.
How do you handle IP-rated (outdoor / wet) lighting?
IP44-IP65 outdoor lighting is manufactured with sealed gasketing, powder-coated corrosion-resistant finishes, and marine-grade hardware. Salt-spray testing (ASTM B117, typically 96-hour or 240-hour) verifies corrosion resistance. IP rating verified through IEC 60529 lab test.
What is the container yield for lighting programmes?
Highly variable by product size. Brass pendants: 800-1,500 pieces per 40-ft container. Chandeliers: 100-300 pieces per container. Wall sconces: 1,200-2,000 pieces per container. Master carton design and packaging development (our packaging-development service) optimises container yield.
Do you handle photometric testing (LM-79 / LM-80) in-house?
LM-79 photometric measurement handled through third-party labs (SGS, Intertek, Bureau Veritas). LM-80 chip degradation testing (6,000-10,000 hour cycle) run at accredited labs — typically requires 12+ months from test start to LM-80 report. Buyers with LED chip suppliers who already have LM-80 data can use that data without repeating the test.
Which hospitality contract programmes have you delivered?
Marriott, Hilton, IHG, Wyndham, Choice Hotels — US chains. Jumeirah, Emaar Hospitality, Rotana, Kempinski — GCC hospitality. Contract programmes typically 12-24 month project cycles, phased delivery to construction sites, progress-payment structures. Case studies available under NDA.
Where this fits
Adjacentservices,categoriesandclusters.
Related services
Product categories we cover
Manufacturing clusters served
Start an enquiry
